logo
  • slider
  • slider

Seaway Heavy Lifting


Hydrauflush was called for a flushing job on the Oleg Strashnov. This had to be done immediately because the vessel had to leave the next morning.

The problem was a break down of the Hammer-hose installation. Our 10ft flushing container was transported to the location in question, after which the service engineers were able to carry out the job in the evening. The next day the vessel could leave the port with a clean system.

 
 

Ask your question Download brochure Request for quotation